Data Centers

Commission Faster, Hand Over Ready to Run

Data center builds compress schedules while thousands of MEP assets must be tagged, tested and commissioned through every level before go-live. foxlogik tracks commissioning from L1 to L5 across every trade, and hands the operator a package they can run on day one.

What breaks today

Where data centers teams lose time and money

  1. 01

    Commissioning gates go-live

    Every level of commissioning must close before the next starts. One trade's open items hold up the whole hall.

  2. 02

    Thousands of assets to track

    Generators, UPS, switchgear, CRAHs and PDUs each need tagging, testing and sign-off. Spreadsheets break at this scale.

  3. 03

    Every trade reports differently

    Electrical, mechanical and controls contractors all submit daily reports in their own format, so progress is a guess.

  4. 04

    Handover isn't what operations needs

    The turnover package arrives as a pile of PDFs. The operator spends months rebuilding the asset register.

How foxlogik fixes it

One answer for each of them

Commissioning gates go-live

L1 to L5 tracked per system

Commissioning checksheets and punch items are tracked per asset and level, so you see exactly what blocks the next gate.

Completion Management

Thousands of assets to track

Asset tests on the device

Test forms with required readings, photos and sign-off, filled in at the asset and attached to its tag.

Smart Forms

Every trade reports differently

One daily report for every trade

Every contractor reports in the same format from the field, so progress rolls up across trades every day.

Field Activity Reporting

Handover isn't what operations needs

A handover the operator can run

Records, manuals and test results are controlled as you go and handed over with the asset register, ready for maintenance.

Document Control

Simplified illustration of the foxlogik interface. Names and figures are sample data.

Technician testing an electrical panel with a multimeter

For general contractors, commissioning agents and owners racing a go-live date.

Works within the rules you already follow

  • Uptime Institute Tier
  • ASHRAE guidelines
  • L1–L5 commissioning
  • CSA Z462 / NFPA 70E

Your forms, checksheets and approvals are configured to the standards your contracts name. Hosting, security and backups are covered in our Trust Center.

Next step

Is commissioning what's holding up go-live?

Let's review how you track L1–L5 and what the operator receives at handover.

  • 25 minutes, no slide deck
  • Run by an engineer, not a sales rep
  • We find out how we can help