foxlogik
High-voltage electrical substation with transformers and power lines

Energy & Utilities

Remote Sites, Lone Workers and Contractor LEMs, Under Control

Operators and service companies run crews across remote sites, verify stacks of contractor LEMs and plan turnarounds that can't run over. foxlogik keeps lone workers checked in, LEMs verified before they're invoiced and the regulatory record in one place.

What breaks today

Where energy & utilities teams lose time and money

  1. 01

    Lone workers out of contact

    Operators drive remote routes alone. A missed check-in is noticed at end of shift, if at all.

  2. 02

    Contractor LEMs are hard to verify

    Labour, equipment and material tickets arrive in bulk at month-end, and checking them against what happened in the field is guesswork.

  3. 03

    Turnarounds run over

    Shutdown scope and cost are tracked in spreadsheets, so overruns show up after the unit is back online.

  4. 04

    Regulatory evidence is scattered

    Inspection records, procedures and approvals sit across email, shared drives and binders when the regulator asks for them.

How foxlogik fixes it

One answer for each of them

Lone workers out of contact

Check-ins with automatic escalation

Scheduled check-ins, a HELP button and escalation to supervisors when one is missed, with the worker's location attached.

Working Alone

Contractor LEMs are hard to verify

LEMs verified before they're invoiced

Contractors submit LEMs digitally against the work order, your field lead approves them the same day, and only approved tickets reach billing.

Field Ticketing & Timesheets

Turnarounds run over

Turnarounds run as projects

Scope, schedule and cost the shutdown with actuals tracked against budget daily, using the same controls as your capital projects.

Maintenance

Regulatory evidence is scattered

One controlled record for the regulator

Procedures, inspection records and approvals are revision-controlled and searchable in one register.

Document Control

Simplified illustration of the foxlogik interface. Names and figures are sample data.

Pumpjacks working an oil field under an open sky

Built for operators and service companies running crews across remote sites.

Works within the rules you already follow

  • CSA Z662
  • AER directives
  • Provincial lone-worker regulations
  • COR / SECOR

Your forms, checksheets and approvals are configured to the standards your contracts name. Hosting, security and backups are covered in our Trust Center.

Next step

How long until a missed check-in gets noticed?

Let's review your lone-worker process, LEM approvals and turnaround planning.

  • 25 minutes, no slide deck
  • Run by an engineer, not a sales rep
  • We find out how we can help